When Do I Have to Order?
Tell us the date the windows are needed in the wall and we will count backwards to the day the deposit has to clear — honestly, including when that day has already gone. On a replacement there is no framing date to count back from, and this page says so rather than asking you for one.
ZIP is optional. Add it and the emailed copy carries the code numbers for your climate zone.
You get the result, not a newsletter. If it points at work worth doing, someone from our team will reach out to help.
This page counts days, not sizes. It assumes your selections are settled and says nothing about whether your openings can be made — an opening past a published maximum changes the schedule before it changes the price. This page's lead time is production and freight from a cleared deposit; your quotation measures the same range from production release. Installation is booked separately against your wall date, and permit or inspection timing sits outside our schedule entirely.
Talk to us about your date